Our Case Studies Shakedown Assessment of Secondary Superheater Boiler Tube

An assessment had previously been completed by EASL looking into the structural integrity of the Heysham 1 and Hartlepool pod boiler super-heater tailpipes. Following a successful completion of this work, EASL was again approached for further scrutiny of the super-heater boiler finned tube at a location termed “strap 5”. EASL performed a shakedown assessment upon the “strap 5” component.